Anonymised projects under mandate

Code name, technology, county, estimated capacity and stage. The detailed sheet opens after identification and an NDA.

Request access

One language for maturity

Seven standard stage labels

Every project carries one of them, assigned from the documents we hold, so parties compare like with like.

  1. 01

    Greenfield

    Site identified, land title available, no permitting started.

  2. 02

    CU stage

    Urbanism certificate obtained, opinions in progress.

  3. 03

    SS stage

    Grid solution study filed or approved.

  4. 04

    ATR issued

    Grid connection permit issued, connection contract not yet signed.

  5. 05

    Grid secured

    ATR, signed connection contract and guarantees paid.

  6. 06

    Ready to build

    All permits obtained, including the building permit.

  7. 07

    COD

    Commercial operation reached.

A teaser, by design

What is shown and what stays protected

Detail opens by tier: after an NDA (T1), then in exclusivity (T2). See how it works.

Shown to qualified parties (T0)

  • Code name
  • Technology (PV, wind, BESS, hybrid)
  • County
  • Estimated capacity (MW)
  • Stage label

Protected until an advanced stage

  • Company identity and owners
  • Exact location, parcel and land data
  • Grid permit numbers and contract details
  • Prices and internal valuations

Looking for something specific?

Tell us technology, capacity and stage. An Operator comes back with the projects that fit.